Some updates on bottleneck timelines:
- ABF substrates: 1 year
/ eg. Ajinomoto (2802) for ABF film, Ibiden, Unimicron, Nan Ya PCB, etc make the substrates
- HDI Boards: Over 6 months
/ Victory Giant (300476), Zhen Ding (4958), Unimicron, Compeq (2313), Meiko (6787)
-